Photo pending
ProyectosFenix Gold
Fenix Gold cover material production
Location
Atacama Region, Copiapó Province
Start
2025
Status
Completed
Production
Equipment
Metso LT96 and Metso LT200S
Summary
We provided full-service aggregate production for Fenix Gold, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train at 4,600 meters above sea level. Our scope covered the production of cover material for heap leach pads, a protective layer with controlled gradation that shields the waterproofing geomembrane from punctures and damage while ore is loaded, while also promoting efficient drainage of the solutions. Working in extreme conditions of altitude, low temperatures, and snow, we demonstrated the ability of our equipment and personnel to maintain operational continuity and product quality, ensuring a reliable supply for Fenix Gold throughout the contract period.
Gallery
The operation, up close
No items found.
Fleet
Equipment used
No items found.
Experience
Featured projects

Contact


