Photo pending
INEL crushers in the snow at 4,600 meters, producing cover material for Fenix Gold
Proyectos
Fenix Gold

Fenix Gold cover material production

Location
Atacama Region, Copiapó Province
Start
2025
Status
Completed
Production
Equipment
Metso LT96 and Metso LT200S
Summary

We provided full-service aggregate production for Fenix Gold, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train at 4,600 meters above sea level. Our scope covered the production of cover material for heap leach pads, a protective layer with controlled gradation that shields the waterproofing geomembrane from punctures and damage while ore is loaded, while also promoting efficient drainage of the solutions. Working in extreme conditions of altitude, low temperatures, and snow, we demonstrated the ability of our equipment and personnel to maintain operational continuity and product quality, ensuring a reliable supply for Fenix Gold throughout the contract period.

Gallery

The operation, up close

No items found.
Fleet

Equipment used

No items found.
Experience

Featured projects

Excavadora, seleccionadora móvil de INEL y cargador frontal trabajando al atardecer en una faena minera sobre las nubes
Contact

Let's talk about your next project