ProyectosHeap construction, phases 4 and 8
We provided full-service aggregate production for Minera Lomas Bayas, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train, supporting the construction of Phases 4 and 8 of its heap leach pad. Our scope covered the production of cover material, an essential component to protect the heap's impermeable base and ensure proper flow of the solutions during leaching. With continuous production aligned with the progress of each construction phase and ongoing gradation control, we delivered reliable material on the required schedule. The results of this project laid the foundation for a relationship of trust with Minera Lomas Bayas, which later called on INEL again for the construction of Phases 5 and 9.