Photo pending
INEL mobile plant discharging material from its conveyor next to an excavator during heap construction at Minera Lomas Bayas
Proyectos
Minera Lomas Bayas

Heap construction, phases 5 and 9

Location
Antofagasta Region
Start
2025
Status
Completed
Production
Equipment
Metso LT96 and Maxtrak 1000SR
Summary

We provided full-service aggregate production for Minera Lomas Bayas, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train, supporting the construction of Phases 5 and 9 of its heap leach pad. Our scope covered the production of cover material, a layer with controlled gradation that protects the heap's waterproofing system, prevents damage to the geomembrane while ore is unloaded, and allows proper percolation of the solutions. With continuous production synchronized with the progress of each construction phase, we ensured timely availability of material and compliance with the technical specifications, helping Minera Lomas Bayas keep the pace of its works program throughout the contract period.

Gallery

The operation, up close

No items found.
Fleet

Equipment used

No items found.
Experience

Featured projects

Excavadora, seleccionadora móvil de INEL y cargador frontal trabajando al atardecer en una faena minera sobre las nubes
Contact

Let's talk about your next project