Photo pending
ProyectosMinera Los Pelambres
Tranque Quillayes granular cover
Location
Coquimbo Region
Start
2023
Status
Completed
Production
Equipment
Mobile crushing and screening equipment
Summary
We provided full-service aggregate production for Minera Los Pelambres, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train, as part of Stage III of the Quillayes tailings dam. Our scope covered the production of minus 4-inch material for the granular cover of the tailings storage facility, a layer that stabilizes the surface, controls erosion, and reduces particulate emissions into the surroundings, helping the operation meet its environmental commitments. Through a controlled crushing and screening process, we ensured material with a consistent gradation and a steady and reliable supply for Minera Los Pelambres throughout the contract period.
Gallery
The operation, up close
No items found.
Fleet
Equipment used
No items found.
Experience
Featured projects

Contact


