Photo pending
ProyectosSCM Minera Lumina Copper Chile
Caserones stemming gravel production
Location
Atacama Region, Minera Caserones
Start
2025
Status
Completed
Production
Equipment
Metso LT96 and Powerscreen Maxtrak 1000SR
Summary
We provided full-service production of stemming gravel for blasting at Minera Caserones, including the mobilization, operation, maintenance, and demobilization of our crushing and screening train. Through a staged crushing process, we obtained cubical, uniformly sized particles that pack tightly in the collar of the blasthole, sealing it effectively and containing the detonation gases. This translates into better use of the explosive's energy, more uniform fragmentation, and a lower risk of flyrock, contributing directly to the productivity and safety of the mining operation. With continuous production and ongoing quality control, we ensured a reliable supply for Minera Lumina Copper Chile throughout the contract period.
Gallery
The operation, up close
No items found.
Fleet
Equipment used
No items found.
Experience
Featured projects

Contact


